Picktree Court

To reduce the number of joints and so lower the risk of any water ingress, the client was looking to place the 1,602 m2 of waterproof concrete required for basement in the largest pours practical. The use of Xypex Admix reduced the number of vertical joints by half over that required by the original specified waterproofing. Being able to place the concrete in bigger pours also reduced the contractor’s time on site along with all the associated costs. Xypex waterproofs the lift pits, basement slab, basement walls, the ring beam and all the joints.