The Peak, Stirling Sports Village

Xypex was specified by the consulting engineers for the waterproofing of the two swimming pools along with the balance tanks. Xypex Admix C-1000 NF was used to waterproof the concrete, whilst a project specific joint system was designed and implemented for all the construction joints, including the kicker.