Wimpey Homes


Approximately 3,000 kg of Xypex Admix C-1000 NF was used on this prestigious development on the banks of the River Thames. Three large units were constructed, each with underground car parks. The floors and walls of each basement were poured with Admix added to the concrete. Between pours, 800 kg of Xypex Concentrate was applied to all cold joints.